Part G water calculations for NHBC, LABC and approvers
Whoever checks your build, the water rule is the same. Here is what NHBC, your council or any other building control approver will ask for, and when.
At a glance
Every new home in England has to meet the water efficiency limit in regulation 36 of the Building Regulations: 125 litres per person per day, or 110 where planning permission makes it a condition. Wales has its own limits. It makes no difference whether your building control is done by the council (LABC), by NHBC or by another registered building control approver. They all check the same regulation, and they all need the same notice within five days of the work being completed.
Checked 23 November 2026 against the Building Regulations 2010 (regulations 36 and 37) and Approved Document G.
Who checks your build
- Your council's Building Control team, often called LABC (local authority building control).
- A registered building control approver, the private option. Since April 2024 these firms have had to register with the Building Safety Regulator, and the old name, approved inspector, is no longer used.
- NHBC, which says it is a registered building control approver and covers new homes in England and Wales.
All of them work to the same Building Regulations and the same Approved Document G, so a water calculation done properly to that method is the same evidence whichever body you use.
What they need from you
Regulation 37 says the person carrying out the work must give the building control body a notice that states:
- which limit applies to the home: 125 litres, or the 110 litre optional requirement; and
- the potential consumption of wholesome water per person per day for the finished home.
The notice is due no later than five days after the work is completed. Approved Document G (paragraph 2.16) says a completion certificate is unlikely to be issued until it has been received. Guidance from LABC adds that building control should also be given the final version of the water efficiency calculation at the same time.
How our report covers it
| They ask for | Where it is |
|---|---|
| Which limit applies | "Applicable requirement" on the report |
| Potential consumption | The litres per person per day figure, with PASS |
| The calculation | The Appendix A calculation schedule |
| Checking it is genuine | The verification link and reference |
See a sample report and schedule. The report is evidence to support your notice. The decision always rests with your building control body, and some ask for the information on their own form or portal, so check how yours likes it sent.
Does NHBC or LABC need a particular calculator?
We have not found any NHBC or LABC rule that says which calculator you must use, and they do not endorse particular tools, ours included. What they look for is a calculation done to the method in Appendix A of Approved Document G, with the fittings that are actually going in. The government's old spreadsheet calculator page was withdrawn in June 2016, and the method is now set out in Appendix A of Approved Document G, so every calculation works from the same published method.
When to do the calculation
- At design stage, so you know the specification passes before anything is ordered. Many surveyors ask to see it with the plans.
- Before completion, run it again with the fittings actually installed. If the shower, taps, toilet or bath changed on site, the figure changes too.
- Within five days of completion, send the notice with the final figure.
Our guide on what to submit to Building Control goes through each stage.
Frequently asked questions
Does NHBC accept your water efficiency report?
Our report and schedule follow Appendix A of Approved Document G and give the details regulation 37 asks for. Your building control body, whether NHBC, LABC or another approver, makes the final decision on any evidence, so check with your surveyor if you are unsure.
What is a registered building control approver?
A private building control firm registered with the Building Safety Regulator. It is the new name for what used to be called an approved inspector, and registration has been required since April 2024.
Is the notice different with a private approver?
No. The same regulation 37 notice applies, with the same five-day deadline after completion.
Do I tell building control if 110 litres applies?
Yes. Approved Document G says you must tell your building control body where the 110 litre optional requirement applies, and the notice must say which limit applies.
What if the fittings change after I have sent it?
Run the calculation again with the new fittings. The notice should give the figure for the home as completed. Re-running our calculator is free.
Is this the same in Wales?
The method is the same, but the limits differ: 110 litres for new-build homes and 125 for conversions. See water calculations in Wales.