Next house type
How would you like to start this water specification?
Why did it fail?
These are the largest contributors in the entered specification. This does not mean a product is defective; it shows where a design change has the greatest influence on the calculation.
Ways to achieve compliance
The options below have been recalculated against your specification. An option is only marked PASS where that change would bring the dwelling within the selected maximum.
View calculation breakdown
Water reuse contribution
Project setup
Your calculation has passed. Review the project setup below before creating the report package.
This house type passes
Your verified specification has been completed.
Saved house types
Get your Building Control reports
Your calculation is complete. Add the report details below and generate the supporting documents for Building Control.
Individual plot numbers and addresses are taken automatically from the house types and plots you entered above.
Your company branding (optional)
Useful for architects, consultants and developers who want the report issued in their own branding.
Complete your plot addresses
Each plot needs the address that should appear on its individual Building Control report.
Your result is free. You only pay if you want the official Building Control PDF reports. An account is created or used securely at checkout.
Part G water-efficiency documents prepared for submission to Building Control. This is not a government-issued certificate, accreditation or approval.
Report cannot be generated yet
Amend the specification using the suggestions above, recalculate, and the PDF report will unlock once the result passes.